Bidford-on-Avon, Warwickshire. Mon to Fri.01789 224228

Prototype to production · stage three

Moving into production tooling — ours, or one you already own.

Whether you're commissioning a steel production tool from us or moving an existing tool from another supplier, the transfer is planned: assessment, trial run, first-off approval, then release.

The detail

Production tool transfer, at group level.

Production tooling is where the programme settles. For new tools, it's built with everything learned from prototype and bridge stages. For transferred tools, it starts with an honest assessment of what's arrived.

Either way, nothing goes into production until you've approved first-off parts from the tool in our hands.

Back to From first prototype to production volume, in planned…

Technician checking silicone parts next to a production moulding machine.

What's involved

Six parts of the work.

New production tools

Compression or LSR steel tools built with earlier learning folded in.

Tool transfer assessment

Condition, completeness and fit to our presses checked on arrival.

Trial run

Parts made and measured before anything is promised.

Refurbishment if needed

Worn or damaged tools repaired, with your agreement.

Paperwork rebuilt

Material spec and process records created where they're missing.

First-off approval

You sign off before the tool is released for production.

Production mould tool opened for inspection with trial parts beside it
Incoming tool checked before production starts

How it runs

Four steps, in order.

  1. 01

    Assess

    Tool and part history reviewed.

  2. 02

    Trial

    Test run and inspection.

  3. 03

    Approve

    First-off parts signed off by you.

  4. 04

    Produce

    Released into production to your forecast.

Is it right for you?

An honest fit check.

A good fit when

  • Your volume now justifies steel tooling
  • Your current supplier is closing or can't keep up
  • You're onshoring tooling from overseas
  • You want production and prototyping under one roof

Probably not the answer when

  • Tools for processes we don't run, such as thermoplastic injection
  • Tools we assess as unsafe or beyond economical repair — we'll say so
  • Volumes still too low to justify production tooling

At a glance

The idea in a picture.

Which route suits your quantity

PrototypesHundredsThousandsTens of thousandsPrototype toolingCompression mouldingTransfer mouldingSolid silicone injectionLSR injection

Swipe to see the whole diagram

A general picture. Shape, material and detail also decide the route, and we talk it through with you.

FAQs

Common questions.

Can you run tools made elsewhere?

Often. We assess each one before committing.

What if paperwork is missing?

We rebuild the material spec and process record from trials.

Who owns transferred tools?

You still do. We store and maintain them on your behalf.

Get in touch

Not sure which division? Tell us what you're making.

Send us a sketch, a photograph, or a paragraph. We'll come back with the right division, the right route, and an honest sense of what it will take.

Real people, a real workshop

You deal with the people who make it.

No call centre and no middlemen. When you contact TCI Group, you speak to the team who design, build and check your mould.

  • A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
  • Real people on the phoneCall the team on 01789 224228, Monday to Friday.
  • The same team on every jobDesign, production and aftercare come from the people you see here.
  • Five brands, one teamMoulds, culinary, construction and contract products, all run from Bidford-on-Avon. See the divisions.
A stack of TCI silicone moulds.
A stack of TCI silicone moulds.
Silicone wax melt moulds made by TCI Mouldings.
Silicone wax melt moulds made by TCI Mouldings.
The TCI workshop, with moulds on the bench mid-build.
The TCI workshop, with moulds on the bench mid-build.
  • Thomas LaneManaging Director
  • George PrestonDesign & Project Manager
  • Kelly BallingerHead of Partnerships
  • Jim AndertonProduction Manager
  • TheodoreEmployee Welfare
Meet the team