Case study · Construction
A heritage restoration project that grew into a repeat cast stone programme.
Started with one silicone mould rebuilding a lost feature. Ended with a rolling programme for a specialist stone contractor.
The brief
What the customer arrived with.
A conservation architect needed a silicone mould made from an existing feature on a listed elevation, so that a replacement in cast stone could be made for a missing counterpart on the same building. It was, initially, a one-off job.

How it went
Stage by stage.
The one-off mould
A hand-laid brush-on silicone mould with a rigid mother mould, taken directly from the surviving feature on site. Silicone chosen for its ability to capture the weathered stone's fine detail without damaging the original.
The replacement casting
The mould was used by the stone contractor to produce the cast stone counterpart. The contractor kept the mould afterwards.
Repeat work
Impressed with the quality of the mould, the stone contractor commissioned five more moulds over the following year for other conservation projects. That grew into a standing supplier relationship for their bespoke restoration jobs.
The paperwork
Every mould was documented with the silicone grade, the pour weight and the mother mould material. Useful for the contractor's own record-keeping on listed-building projects.
Lessons
What we took from the job.
What we took from it
One-off restoration jobs often mature into repeat relationships if the first mould performs well.
What we took from it
The engineering behind a heritage silicone mould is often more demanding than production tooling — the master can't be modified, and the mould has to come off without damage.
What we took from it
Documentation matters even for one-off jobs, because the finished feature will outlive several supplier relationships.

Related
Where to read next.
Applications
Umbrella-level applications we cover.
UK-designed, UK-made, coordinated from one Warwickshire workshop.
Our design and development sits in Bidford-on-Avon. So does the majority of our moulding. Some higher-volume production…
One phone call, one engineer, however many divisions it touches.
TCI Group is four brands with one workshop behind them. If a job spans Mouldings and Products, or Culinary and…
The group
Which divisions worked on this
Every case study is a project we've delivered. The specific customer isn't named — the pattern is what matters.

Get in touch
Not sure which division? Tell us what you're making.
Send us a sketch, a photograph, or a paragraph. We'll come back with the right division, the right route, and an honest sense of what it will take.
Real people, a real workshop
You deal with the people who make it.
No call centre and no middlemen. When you contact TCI Group, you speak to the team who design, build and check your mould.
- A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
- Real people on the phoneCall the team on 01789 224228, Monday to Friday.
- The same team on every jobDesign, production and aftercare come from the people you see here.
- Five brands, one teamMoulds, culinary, construction and contract products, all run from Bidford-on-Avon. See the divisions.



Thomas LaneManaging Director
George PrestonDesign & Project Manager
Kelly BallingerHead of Partnerships
Jim AndertonProduction Manager
TheodoreEmployee Welfare