One quote · itemised
Every line labelled. Tooling and parts never rolled together.
A group quote is one document, grouped by division, with tooling and unit cost on separate lines and assumptions written out. You can see exactly what you're paying for and who's doing it.
The detail
Itemised group quote, at group level.
An honest quote is the start of an honest job. We itemise so you can compare us fairly, challenge a line if you want to, and budget tooling and parts separately.
When the job crosses divisions, the grouping shows you which bench does what without making you manage four quotes.
Back to One quote. Itemised by division. Nothing rolled up to hide…

What's involved
Six parts of the work.
Grouped by division
Each division's work in its own section with a subtotal.
Tooling separate
Tool build shown once, never hidden in part prices.
Unit cost by volume
Part prices at the volumes you care about.
Assumptions stated
Material, route, finish and inspection written into the quote.
Timeline per line
Each stage shown so you can see the critical path.
Options, not surprises
Alternatives priced side by side where they're worth considering.

How it runs
Four steps, in order.
- 01
Brief
The whole programme, not just stage one.
- 02
Skeleton
Rough numbers to check it's worth pursuing.
- 03
Detailed quote
Itemised by division and stage.
- 04
Revisions
Changed and reissued as the brief firms up.
Is it right for you?
An honest fit check.
A good fit when
- You need to compare us against other suppliers line by line
- Tooling and parts come from different budgets
- Your job touches more than one division
- You need to explain the cost to someone else internally
Probably not the answer when
- You only want a single headline number — we can add one, but we'll still itemise
- The brief is too early to price — start with a consultation
- Ongoing call-off pricing — see supply chain coordination
At a glance
The idea in a picture.
One enquiry, the right team
- 01One enquiryTell us what you need
- 02Right divisionWe bring in the specialists
- 03One quoteCovering every part of the job
- 04Named contactOne person keeps it moving
- 05DeliveredMoulds, parts or both
Swipe to see the whole diagram
FAQs
Common questions.
Why separate tooling and parts?
So order one doesn't look cheap and order two expensive, or the reverse.
Can you quote alternatives?
Yes. Two routes or two materials side by side is common.
How long is a quote valid?
It's stated on the quote, and depends mainly on material prices.
Related
The rest of this service.
Paperwork that fits your finance team, not ours.
One PO across the group, one per division, or one for tooling and one for parts. Consolidated invoicing or split. We…
The moulding part of your bid, priced properly and on time.
You're bidding for a contract that includes moulded parts or tooling — formliners on a building, seals in an assembly,…
One quote. Itemised by division. Nothing rolled up to hide the arithmetic.
When a job touches more than one TCI brand, we quote it once, as one document, with each division's line clearly…
The group
Delivered across the group
This work is coordinated by TCI Group and carried out by whichever of the four divisions suits your part.

Get in touch
Not sure which division? Tell us what you're making.
Send us a sketch, a photograph, or a paragraph. We'll come back with the right division, the right route, and an honest sense of what it will take.
Real people, a real workshop
You deal with the people who make it.
No call centre and no middlemen. When you contact TCI Group, you speak to the team who design, build and check your mould.
- A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
- Real people on the phoneCall the team on 01789 224228, Monday to Friday.
- The same team on every jobDesign, production and aftercare come from the people you see here.
- Five brands, one teamMoulds, culinary, construction and contract products, all run from Bidford-on-Avon. See the divisions.



Thomas LaneManaging Director
George PrestonDesign & Project Manager
Kelly BallingerHead of Partnerships
Jim AndertonProduction Manager
TheodoreEmployee Welfare
